Hi, is there some limit to how big a revit project can be for live sync to actually work?
I have a revit link of surrounding buildings which contains another 2 links of pretty big and detailed buildings and then another revit link of the main building. It doesn’t sync, gets stuck and revit stops responding. Which I think is very odd, because the exact same model synced fine with Lumion.
Thank You.
D5 Render Version:
Graphics Card:
Driver Version:
Issue Description:
Screenshots/Videos Description:
Steps to Reproduce (optional):