Revit Converter - Project Base Point

Is it possible to have the D5 converter export the models based on “Project Base Point”? Currently using Survey Point means having to manually rotate each model. It would be much easier if every model was exported with the same project base point, meaning it wouldn’t have to move in D5.

Hi,gadgets.
You can find the “sync origin” function in the right-click menu on the left sidebar.

Hi mate, check the Use Survey Point option in Settings of D5 Converter for Revit. And in D5 Render, you can use the Sync origin feature as Zero_PM mentioned. If you have other suggestions or ideas, feel free to post here to share with us. :grin: